Situation · Demolition strip-out
A building coming down releases cable in a shape nobody drew.
Riser cable cut at the floor deck, service conductors pulled back through a conduit, and a roll-off container of mixed material whose boundary was never agreed before the strip-out started.
Nothing about a strip-out is tidy. Cable comes out of a ceiling in the order the building lets go of it, risers are cut where the floor deck ends, and service conductors arrive at the laydown in whatever lengths the saw allowed. The lot is described as it comes out, not as it was designed.
That is workable, provided the boundary is agreed before anything is cut. What is in the lot, what stays with the building, and who confirms the circuits are dead are three questions a demolition contractor can usually answer in a single message before the first saw goes in.
Buy quote request
Tell us what you have
Type, conductor, voltage class and how much is on hand. Photos can follow by text or email. A buyer reviews the lot before anyone talks about money.
Prefer to talk it through? 954-740-1983 · saleselectricalbuyers@gmail.com
01 Isolation
Isolation is a document, not a nod
Demolition cable is only cable once the circuit is dead, locked out and disconnected at both ends. A verbal assurance on a site walk is not that. The review needs something in writing from the contractor or the owner naming the building, the systems and the date the isolation was applied.
Where the strip-out is staged floor by floor, isolation follows the same order. A riser that is still connected at the top because a switch was thrown somewhere in the basement is not a lot anyone should be asked to handle, and no buyer will accept one.
02 Removal
Cutting versus coiling
Length survives removal or it does not. A service conductor pulled back through a conduit and coiled on a spindle keeps a usable length; the same conductor cut into four pieces to get it down a stairwell does not. The difference is decided by the person holding the saw, not by the buyer.
Where a run has to be cut, cut it once. One cut leaves two lengths and a record of where they came from; a run chopped at every turn becomes scrap and is reviewed as scrap, whatever its gauge. Crews who coil as they go consistently produce a better lot than crews who cut to move.
03 Loads
Riser, service and mixed loads
Demolition lots rarely arrive as one voltage class. Riser cable, panel feeders, service entrance conductors, tray cable from a mechanical floor and the copper from a telecom room all come out of the same building and land in the same container unless someone intervenes on site.
Sorting by class before pickup helps where there is space. Riser and service cable at the larger sizes are the lines a buyer looks at first, and keeping them clear of armoured cut-offs and fit-out offcuts stops the good material being described as part of a mixed load.
Fire alarm, control and communications cable come out with the power cable and are reviewed as their own lines. Say so at the start rather than letting them disappear into the pile.
04 Boundary
Agree the boundary first
The boundary question sounds administrative until the truck is loaded. Does the lot include cable in the ground outside, the tray and strut, the busway, the transformers, or the copper bus inside the switchgear? Each of those is a different removal and a different permission.
Write it down. A lot described as all cable from the building and a lot described as cable from the electrical rooms, risers and ceiling voids, excluding service laterals and site lighting, are not the same job. The second one gets collected without an argument at the gate.
FAQ Seller questions
What sellers ask before they send a list
Answers describe how the buying desk works. They are not an offer, a rate or a promise of purchase.
When does demolition cable become available to sell?
Once it is de-energised, disconnected and released by whoever owns it. On a demolition site that usually means after the isolation record and after the owner has confirmed the material is included in the strip-out contract. Nothing is removed from a live system under any circumstances.
Should the crew cut cable to get it out faster?
Cut once where a cut is unavoidable, and coil wherever it is not. Length is what makes removed cable reusable, and every extra cut shortens it. Crews working to a demolition schedule tend to cut for speed, so it is worth saying at the start which runs should come out whole.
Can riser cable be reused after a strip-out?
Sometimes. Riser cable pulled in long lengths and coiled without damage is reviewed on its remaining length and jacket condition. Cable cut at every floor landing is not reusable as a run and is reviewed on what it contains instead. The removal method decides which of those two lots exists.
What is usually excluded from a demolition lot?
Anything not named in writing: service laterals still in the ground, site lighting, busway, transformers and the copper bus inside switchgear are common exclusions. Trays, strut and conduit are also separate. The terms list what is included, and everything else stays with the demolition contract.
Can a demolition lot include cable from more than one building?
Yes, and it often does on a campus or a phased demolition. Each building is listed as its own group with its own isolation reference. Combining them into one collection is normal; combining them into one description loses the history that makes the larger conductors worth looking at.
Buy quote request
Tell us what you have
Type, conductor, voltage class and how much is on hand. Photos can follow by text or email. A buyer reviews the lot before anyone talks about money.
Prefer to talk it through? 954-740-1983 · saleselectricalbuyers@gmail.com